Bishopsgate Cross Route

[A10] Leadenhall Street (EC3V,EC3A) (City Of London)

  Closures

From: Monday 07 January 2019
To: Sunday 31 March 2019

Last updated 14:33 Monday 18 March 2019 : Use an alternative route. Delays are possible.

Works | Utility

Leadenhall Street and Cornhill (EC3) (Both Directions) at the junction of [A10] Bishopsgate - Closed in both directions during Reach Active works. From approximately 0800hrs Saturday 16 until 2359hrs Sunday 17 March, [A10] Bishopsgate (Both Directions), single alternate lane working under temporary traffic signal control. Monday 25 to Thursday 28 March, inclusive, between approximately 2000hrs and 0600hrs each night, [A10] Bishopsgate (Both Directions), closed.

  • A10 (EC3V) (Both Directions)
  • Billiter Street (EC3A) (All Directions)
  • Cornhill (EC3V,EC2R) (Both Directions)
  • Creechurch Lane (EC3A) (All Directions)
  • Fenchurch Street (EC3N) (All Directions)
  • Finch Lane (EC3V) (All Directions)
  • Leadenhall Street (EC3V,EC3A) (Both Directions)
  • Lime Street (EC3V) (All Directions)
  • Lombard Street (EC3V) (All Directions)
  • Mansion House Place (EC3V) (All Directions)
  • Mansion House Street (EC3V,EC2R) (All Directions)
  • St Mary Axe (EC3V) (All Directions)
  • Threadneedle Street (EC3V,EC2R) (All Directions)
  • Whittington Avenue (EC3V) (All Directions)

Bishopsgate Cross Route

[A3] Arthur Street (EC4R,EC3R) (City Of London)

  Closures

From: Monday 05 January 2015
To: Saturday 31 July 2021

Last updated 14:29 Monday 18 March 2019 : Use an alternative route. Delays are possible.

Works | TfL

[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed. Find out more about Bank and Monument works

  • [A3] Arthur Street (EC4R,EC3R) (Both Directions)
  • Martin Lane (EC4R) (All Directions)

Inner Ring

[A5] Edgware Road (W1H,W2) (Westminster)

  Closures

From: Monday 07 January 2019
To: Monday 01 April 2019

Last updated 14:32 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A5] Edgware Road (W2/W1H) (Both Directions) at the junction of Harrowby Street - The carriageway will be restricted for Central London Grid Cycling Scheme. Burwood Place and Harrowby Street are closed. Temporary pedestrian signals are operating. Monday 25 March, [A5] Edgware Road (Northbound), closed between approximately 2000hrs and 0600hrs. Tuesday 26 March, [A5] Edgware Road (Southbound), closed between approximately 2000hrs and 0600hrs.

  • Burwood Place (W2) (All Directions)
  • [A5] Edgware Road (W1H,W2) (Both Directions)
  • Harrowby Street (W1H) (All Directions)
  • Park West Place (W2) (All Directions)

Inner Ring

[B504] Judd Street (NW1,WC1H) (Camden)

  Closures

From: Monday 28 January 2019
To: Sunday 31 March 2019

Last updated 20:40 Monday 18 March 2019 : Traffic is flowing well at this time.

Works | TfL

[B504] Judd Street (WC1) (Both Directions) at the junction of [A501] Euston Road - The road is closed for junction improvement work and the installation of a cycle route. Additionally, [A501] Euston Road (Westbound), lane one (bus lane) closed, [A5202] Midland Road (Southbound), lane three closed. Monday 18 March, [A501] Euston Road, closed eastbound between approximately 22:00 and 05:00. Tuesday 19 March, [A501] Euston Road, closed westbound between approximately 22:00 and 05:00. From approximately 07:00 Wednesday 20 March, [A501] Euston Road, lane restrictions in both directions.

  • [A501] Euston Road (NW1) (All Directions)
  • [B504] Judd Street (NW1,WC1H) (Both Directions)
  • Midland Road (NW1) (All Directions)

Inner Ring

[A501] Melton Street (NW1) (Camden)

  Closures

From: Sunday 06 January 2019
To: Friday 30 April 2021

Last updated 14:30 Monday 18 March 2019 : Traffic delays are possible on the approach.

Works | Other

Melton Street (NW1) (Both Directions) at the junction of Euston Road - HS2 will be relocating the Euston Station Taxi rank from its current location in the station basement to the east side of Euston Square Gardens. The road is closed, except for taxi access to the new rank.

  • [A501] Euston Road (NW1) (All Directions)
  • Euston Station (NW1) (All Directions)
  • Euston Street (NW1) (All Directions)
  • Gordon Street (NW1,WC1H) (All Directions)
  • Melton Street (NW1) (Eastbound)

Inner Ring

[A4201] Park Crescent (W1B) (Westminster)

  Closures

From: Thursday 11 January 2018
To: Monday 01 July 2019

Last updated 14:28 Monday 18 March 2019 : Use other routes.

Works | Borough

Park Crescent (NW1/W1G/W1B) (Southbound) at the junction of [A501] Marylebone Road - Closed due to works by Westminster City Council.

  • [A501] Marylebone Road (W1G,NW1,W1B) (Eastbound)
  • [A4201] Park Crescent (W1B) (Southbound)
  • Park Crescent Mews West (W1G) (All Directions)
  • Park Square West (NW1) (All Directions)
  • Ulster Place (NW1) (All Directions)

[A4201] Albany Street (NW1) (Camden)

  Closures

From: Thursday 03 January 2019
To: Saturday 31 August 2019

Last updated 14:49 Monday 18 March 2019 : Delays are possible.

Works | Utility

[[A4201] Albany Street (All Directions) at the junction of Gloucester Gate - Temporary traffic lights are in use to enable works by Thames Water. Gloucester Gate is closed.

  • [A4201] Albany Street (NW1) (All Directions)
  • Gloucester Gate (NW1) (All Directions)

[A239] Cricket Green (CR4) (Merton)

  Closures

From: Wednesday 27 February 2019
To: Sunday 24 March 2019

Last updated 19:19 Monday 18 March 2019 : Traffic is flowing well.

Works | Borough

[A239] Cricket Green (CR4) (Westbound) between Madeira Road and London Road - Road closed to facilitate works by the London Borough of Merton.

  • [A239] Cricket Green (CR4) (Westbound)

[A118] Romford Road (E7) (Newham)

  Closures

From: Tuesday 05 March 2019
To: Thursday 21 March 2019

Last updated 14:59 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A118] Romford Road (E7) (Eastbound) between Sprowston Road and Woodgrange Road - The carriageway has been reduced to one lane both ways for sewer repairs.

  • [A118] Romford Road (E7) (Eastbound)

[A222,A214] Croydon Road (BR3) (Bromley)

  Closures

From: Thursday 14 March 2019
To: Wednesday 20 March 2019

Last updated 19:07 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A222] Croydon Road (BR3) (Northbound) at the junction of Elmers End Road - Closed during repairs to a gas leak.

  • A214 (BR3) (All Directions)
  • [A222,A214] Croydon Road (BR3) (Northbound)

[A23] Kennington Road (SE1) (Lambeth)

  Closures

From: Wednesday 09 January 2019
To: Friday 10 May 2019

Last updated 14:28 Monday 18 March 2019 : Delays are possible on the approach.

Works | Borough

[A23] Kennington Road (SE1) (Northbound) at the junction of Westminster Bridge Road - Various restrictions until approximately mid-May during junction improvement works. All approaches to the junction are restricted. Hercules Road is closed to traffic. Temporary traffic signals in operation.

  • [B300] Baylis Road (SE1) (All Directions)
  • Hercules Road (SE1) (All Directions)
  • [A23] Kennington Road (SE1) (Northbound)
  • Newnham Terrace (SE1) (All Directions)
  • [A23] Westminster Bridge Road (SE1) (All Directions)
  • [A3202,A23] Westminster Bridge Road (SE1) (All Directions)

A205

[A205] Waldram Crescent (SE23) (Lewisham)

  Closures

From: Friday 15 March 2019
To: Monday 18 March 2019

Last updated 19:16 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A205] Waldram Crescent (Both Directions) at the junction of [B227] Waldram Place - Contra-flow in operation during emergency Thames Water works. Additionally, [B227] Waldram Place is closed.

  • Devonshire Road (SE23) (All Directions)
  • [A205] Devonshire Road (SE23) (All Directions)
  • Perry Vale (SE23) (All Directions)
  • Stanstead Road (SE23) (All Directions)
  • [A205] Waldram Crescent (SE23) (Both Directions)
  • [A205] Waldram Park Road (SE23) (All Directions)
  • [B227] Waldram Place (SE23) (Both Directions)

A205

A406

[A2204] Woolwich Ferry (SE18) (Greenwich)

  Closures

From: Friday 05 October 2018
To: Ongoing

Last updated 19:17 Monday 18 March 2019 : A limited service is in operation on the Woolwich Ferry.

Works | TfL

[A2204] Woolwich Ferry (Both Directions) - Currently running a limited service during operating hours. Normal operating hours; Monday to Saturday, and public holidays, 0610hrs to 2000hrs and Sunday 1130hrs to 1930hrs, with the last northbound trip 1915hrs. The ferry has been suspended due to high winds. More information. More information.

  • [A2204] New Ferry Approach (SE18) (All Directions)
  • [A117] Pier Road (E16) (All Directions)
  • Pier Road (All Directions)
  • [A2204] Woolwich Ferry (SE18) (Both Directions)

City Route

Southern River Route

[A302] Westminster Bridge (SW1A,SE1) (Lambeth,Westminster)

  Closures

From: Monday 18 March 2019
To: Saturday 23 March 2019

Last updated 21:31 Monday 18 March 2019 : Expect delays.

Works | TfL

[A302] Westminster Bridge (SE1) (Both Directions) at the junction of [A3036] South Lambeth Road - Various closures between approximately 2130hrs and 0500hrs each night during road resurfacing works. Monday 18 and Tuesday 19 March, inclusive, closed southbound. Wednesday 20 until Friday 22 March, inclusive, closed northbound.

  • Belvedere Road (SE1) (All Directions)
  • [A302] Bridge Street (SW1A,SE1) (All Directions)
  • [A3036,A23] Lambeth Palace Road (SE1) (All Directions)
  • [A302] Westminster Bridge (SW1A,SE1) (Southbound)
  • [A302] Westminster Bridge Road (SW1A,SE1) (All Directions)
  • York Road (All Directions)
  • [A3200] York Road (SE1) (All Directions)

City Route

Farringdon Cross Route

[A3211] Victoria Embankment (EC4Y,EC4V) (City Of London)

  Closures

From: Wednesday 04 January 2017
To: Saturday 31 December 2022

Last updated 14:29 Monday 18 March 2019 : Traffic delays are possible.

Works | Utility

[A3211] Victoria Embankment (EC4) (Both Directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions have been implemented for the Tideway works. A diversion is in place for traffic wishing to access [A3211] Victoria Embankment westbound. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street, [A4] Strand, Arundel Street and Temple Place. The Cycle Superhighway has a new layout. Find out more about the road changes at Victoria Embankment.

  • Apothecary Street (EC4V) (All Directions)
  • Black Friars Lane (EC4V) (All Directions)
  • [A201] Blackfriars Bridge (EC4V,EC4Y,SE1) (All Directions)
  • Blackfriars Court (EC4V) (All Directions)
  • Blackfriars Passage (EC4V) (All Directions)
  • [A3211] Blackfriars Station (EC4Y,EC4V) (All Directions)
  • [A3211] Blackfriars Underpass (EC4Y,EC4V) (Eastbound)
  • Temple Avenue (EC4Y) (All Directions)
  • Tudor Street (EC4Y,EC4V) (All Directions)
  • [A3211] Victoria Embankment (EC4Y,EC4V) (Both Directions)
  • [A201] Victoria Embankment (EC4V,EC4Y,SE1) (Both Directions)
  • Victoria Embankment (EC4Y) (All Directions)
  • Watergate (EC4V) (All Directions)

Western Cross Route

[A3212] Lupus Street (SW1V) (Westminster)

  Closures

From: Thursday 03 January 2019
To: Sunday 31 March 2019

Last updated 14:25 Monday 18 March 2019 : Traffic delays on the surrounding routes are possible.

Works | Borough

Lupus Street (SW1V) (Both Directions) between Grosvenor Road and Westmoreland Terrace - The road is closed for gas main replacement on behalf of Westminster City Council.

  • Churchill Gardens Road (SW1V) (All Directions)
  • [A3212] Grosvenor Road (SW1V,SW11) (All Directions)
  • Lupus Street (SW1V) (Both Directions)
  • Paxton Terrace (SW1V) (All Directions)
  • Turpentine Lane (SW1V) (All Directions)
  • Westmoreland Terrace (SW1V) (All Directions)

[A4] Pall Mall (SW1Y) (Westminster)

  Closures

From: Monday 11 March 2019
To: Saturday 20 April 2019

Last updated 14:26 Monday 18 March 2019 : Expect delays.

Works | Borough

[A4] Pall Mall (Eastbound) between Waterloo Place and [A4] Haymarket - Closed during junction improvement works on behalf of Westminster council.

  • [A4] Cockspur Street (SW1Y) (All Directions)
  • [A4] Haymarket (SW1Y) (All Directions)
  • [A4] Pall Mall East (SW1Y) (All Directions)
  • Suffolk Place (SW1Y) (All Directions)
  • Suffolk Street (SW1Y) (All Directions)
  • [A4] Waterloo Place (SW1Y) (All Directions)
  • Waterloo Place (SW1Y) (All Directions)

[A4201] Regent Street (W1W,W1D,W1B,W1G) (Westminster)

  Closures

From: Monday 18 March 2019
To: Thursday 21 March 2019

Last updated 21:01 Monday 18 March 2019 : Traffic is flowing well on diversion.

Works | Emergency

[A4201] Regent Street (W1B/W1G) (Southbound) between Oxford Circus and Great Marlborough Street - The road is closed to facilitate emergency Thames Water works.

  • Great Marlborough Street (W1B) (All Directions)
  • [A4201] Great Portland Street (W1W,W1D,W1B,W1G) (All Directions)
  • Hanover Street (W1B,W1S) (All Directions)
  • Harewood Place (W1S) (All Directions)
  • Hills Place (W1F) (All Directions)
  • Holles Street (W1G) (All Directions)
  • John Prince's Street (W1C,W1G) (All Directions)
  • Kingly Street (W1B) (All Directions)
  • Little Argyll Street (W1B) (All Directions)
  • Little Marlborough Street (W1B) (All Directions)
  • [A40] Oxford Street (W1F,W1D,W1B,W1C,W1G) (All Directions)
  • Princes Street (W1B) (All Directions)
  • Swallow Place (W1B) (All Directions)

[A5202] Goods Way (N1C) (Camden)

  Closures

From: Friday 21 December 2018
To: Friday 29 March 2019

Last updated 14:27 Monday 18 March 2019 : Use an alternative route. Delays are possible.

Works | Borough

[A5202] Goods Way (All Directions) at the junction of Pancras Road - The road is closed eastbound for local authority works.

  • Camley Street (N1C) (All Directions)
  • [A5202] Camley Street (N1C) (All Directions)
  • [A5202] Goods Way (N1C) (All Directions)
  • [A5202] Pancras Road (N1C) (All Directions)

[A2215] Rye Lane (SE15) (Southwark)

  Closures

From: Monday 07 January 2019
To: Monday 06 January 2020

Last updated 15:24 Monday 18 March 2019 : Use an alternative route.

Works | Utility

Rye Lane (SE15) (Both Directions) between Highshore Road and Heaton Road - Road closure due to gas main replacement work.

  • Elm Grove (SE15) (All Directions)
  • [A2215] Hanover Park (SE15) (All Directions)
  • Parkstone Road (SE15) (All Directions)
  • [A2215] Rye Lane (SE15) (Both Directions)
  • Rye Lane (SE15) (All Directions)

A1

[A1200] Highbury Corner (N1) (Islington)

  Moderate

From: Friday 08 June 2018
To: Monday 11 November 2019

Last updated 14:50 Monday 18 March 2019 : Delays are possible.

Works | TfL

Highbury Corner Roundabout, Highbury Corner (N1) (All Directions) - Various lane closures in place to facilitate gyratory scheme works. From approximately 2000hrs Friday 5 until 0500hrs Monday 8 April and between approximately 2000hrs and 0500hs each night on the nights of Monday 8, Tuesday 9 and Wednesday 10 April, inclusive, closed during road resurfacing works. Expected to switch to two-way traffic over the Easter weekend, Friday 19 to Monday 22 April. More information

  • Assata Mews (N1) (All Directions)
  • [A1200] Canonbury Road (N1) (All Directions)
  • Compton Road (N1) (All Directions)
  • Compton Terrace (N1) (All Directions)
  • Corsica Street (N5) (All Directions)
  • Crane Grove (N7) (All Directions)
  • Laycock Street (N1) (All Directions)
  • Swan Yard (N1) (All Directions)

A12

[A127] Southend Arterial Road (RM2) (Havering)

  Moderate

From: Sunday 13 March 2016
To: Sunday 31 March 2019

Last updated 15:02 Monday 18 March 2019 : Delays are possible.

Works | TfL

Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions in place during bridge replacement works. Thursday 28 March, Ardleigh Green Road (Both Directions) at the junction of [A127], closed between approximately 1930hrs and 0500hrs during overnight road resurfacing works on behalf of the borough of Havering. Find out more about the Ardleigh Green bridge replacement.

  • Southend Arterial Road (All Directions)

A205

[A205] London Road (SE23) (Lewisham)

  Moderate

From: Saturday 16 February 2019
To: Friday 12 April 2019

Last updated 19:08 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A205] London Road (SE23) (Westbound) at the junction of Sydenham Hill - One lane closed to facilitate works by Thames Water.

  • [A205] London Road (SE23) (Westbound)

A205

[B210] Artillery Place (SE18) (Greenwich)

  Moderate

From: Saturday 13 October 2018
To: Thursday 31 October 2019

Last updated 14:44 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

[B210] Artillery Place (Both Directions) at the junction of Belford Grove - Two way temporary traffic signals are operating a single alternate lane for construction works.

  • [B210] Artillery Place (SE18) (Both Directions)
  • Belford Grove (SE18) (All Directions)
  • [A205] John Wilson Street (SE18) (All Directions)
  • John Wilson Street (All Directions)
  • Rectory Place (SE18) (All Directions)
  • [B210] Wellington Street (SE18) (All Directions)

A205

[A205] Waldram Park Road (SE23) (Lewisham)

  Moderate

From: Friday 15 March 2019
To: Ongoing

Last updated 14:36 Monday 18 March 2019 : Approach with caution.

Hazard(s) | Collapsed Manhole

[A205] Waldram Park Road (SE23) (Eastbound) at the junction of Westbourne Drive - Collapsed gully at this location.

  • Stanstead Road (SE23) (All Directions)
  • [A205] Waldram Park Road (SE23) (Eastbound)
  • Westbourne Drive (SE23) (All Directions)

A205

[A205] Upper Richmond Road West (SW14) (Richmond Upon Thames)

  Moderate

From: Saturday 16 March 2019
To: Friday 22 March 2019

Last updated 19:16 Monday 18 March 2019 : Minor delays on approach.

Works | Utility

[A205] Upper Richmond Road West (SW14) (Both Directions) near the junction of Sheen Gate Gardens - Single alternate lane traffic under temporary traffic signal control during emergency Thames Water works.

  • Carlton Road (SW14) (All Directions)
  • Chestnut Mews (SW14) (All Directions)
  • Colston Road (SW14) (All Directions)
  • Connaught Avenue (SW14) (All Directions)
  • Coval Road (SW14) (All Directions)
  • Elm Road (SW14) (All Directions)
  • Leinster Avenue (SW14) (All Directions)
  • Model Cottages (SW14) (All Directions)
  • Penrhyn Crescent (SW14) (All Directions)
  • Sheen Gate Gardens (SW14) (All Directions)
  • Temple Sheen Road (SW14) (All Directions)
  • [A205] Upper Richmond Road West (SW14) (Both Directions)

A205

[A3] North Side Wandsworth Common (SW18) (Wandsworth)

  Moderate

From: Monday 12 March 2018
To: Sunday 05 January 2020

Last updated 14:34 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A3] North Side Wandsworth Common (SW18) (Westbound) at the junction of Huguenot Place and Woodwell Street - Lane four (of four) is closed for road works and crane operations. Lane one (of two) on Woodwell Street is closed between North Side Wandsworth Common and East Hill.

  • A214 (SW18) (Northbound)
  • [A3] North Side Wandsworth Common (SW18) (All Directions)
  • Wandsworth Common West Side (SW18) (All Directions)

A3

[A3] Kingston By-Pass (KT9,KT6,KT5) (Kingston Upon Thames)

  Moderate

From: Thursday 07 February 2019
To: Saturday 30 March 2019

Last updated 19:18 Monday 18 March 2019 : Traffic is flowing well.

Works | Emergency

[A3] Kingston Bypass (Southbound) between Tolworth Underpass (A240) and Hook Underpass (A243) - Lane one (of three) is closed for emergency barrier work.

  • A240 (KT6,KT5) (All Directions)
  • A243 (KT6,KT9) (All Directions)
  • A309 (KT9) (All Directions)
  • Ace Parade (KT9) (All Directions)
  • Ashcroft Road (KT6) (All Directions)
  • Barnsbury Lane (KT5) (All Directions)
  • Broad Oaks (KT6) (All Directions)
  • Chaffinch Close (KT6) (All Directions)
  • Cranborne Avenue (KT6) (All Directions)
  • Donald Woods Gardens (KT5) (All Directions)
  • Elmcroft Drive (KT9) (All Directions)
  • Fullers Way North (KT6) (All Directions)
  • Fullers Way South (KT9) (All Directions)
  • Hook Rise North (KT6) (All Directions)
  • [A3] Hook Rise North (KT9,KT6,KT5) (All Directions)
  • Hook Rise South (KT6,KT9) (All Directions)
  • [A3] Hook Rise South (KT9,KT6,KT5) (All Directions)
  • [A3] Hook Underpass (A3) (KT9,KT6,KT5) (All Directions)
  • Lansdowne Close (KT5) (All Directions)
  • Princes Avenue (KT6) (All Directions)
  • Queen Mary Close (KT6) (All Directions)
  • St George's Gardens (KT6) (All Directions)
  • Toby Way (KT5) (All Directions)
  • [A3] Tolworth Underpass (A3) (KT9,KT6,KT5) (All Directions)

A3

Wandsworth Gyratory

  Moderate

Provisional dates:
From: Monday 01 January 2018
To: Wednesday 01 January 2020

Last updated 15:58 Tuesday 12 March 2019

Works | TfL Works

Gyrathory changes to two way flows

A316

Twickenham Bridge

  Moderate

Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021

Last updated 15:58 Tuesday 12 March 2019

Works | TfL Works

Twickenham Bridge, Bridge  Concrete repairs and waterproofing.

A4

[A4] Brompton Road (SW3,SW1X) (Westminster,Kensington & Chelsea)

  Moderate

From: Monday 29 May 2017
To: Monday 30 November 2020

Last updated 14:31 Monday 18 March 2019 : Traffic delays are possible.

Works | TfL

[A4] Brompton Road (SW3) (Westbound) after the junction of [A4] Knightsbridge (Scotch Corner) - Lane one (of three) closed until late 2020 during station upgrade works.

  • Basil Street (SW3) (All Directions)
  • [A4] Knightsbridge (SW3,SW1X) (All Directions)
  • [A4,A315] Knightsbridge (SW1X) (All Directions)
  • Knightsbridge Green (SW1X) (All Directions)
  • Pavilion Road (SW1X) (All Directions)
  • Raphael Street (SW7) (All Directions)
  • Seville Street (SW1X) (All Directions)
  • [A3216] Sloane Street (SW1X,SW3) (All Directions)

A4

A306 (W6) (Hammersmith & Fulham)

  Moderate

From: Saturday 28 May 2016
To: Tuesday 31 December 2019

Last updated 14:43 Monday 18 March 2019 : Delays are possible.

Works | Other

[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. Pedestrian access is maintained throughout. More information on the London Borough of Hammersmith & Fulham's website.

  • Crisp Road (W6) (All Directions)
  • Queen Caroline Street (W6) (All Directions)
  • Worlidge Street (W6) (All Directions)

A406

Brent Cross

  Moderate

Provisional dates:
From: Friday 01 September 2017
To: Friday 31 December 2021

Last updated 15:58 Tuesday 12 March 2019

Works | TfL Works

CS11 and Brent Cross Cricklewood Regeneration

A406

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W3,W4) (Hounslow)

  Moderate

From: Monday 20 June 2016
To: Friday 19 April 2019

Last updated 14:50 Monday 18 March 2019 : Delays are possible.

Works | TfL

Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. More information on the Power Road Bridge project.

  • [A406] Gunnersbury Avenue (North Circular Road) (W3,W4) (Northbound)

A406

[A1055] Meridian Way (N18,N17) (Enfield,Haringey)

  Moderate

From: Monday 11 February 2019
To: Friday 10 May 2019

Last updated 14:48 Monday 18 March 2019 : No reported delays.

Works | Other

[A1055] Meridian Way (N18/N17) (Northbound) between Leeside Road and Angel Road - Lane one (of two) closed to facilitate the construction of a new railway station.

Bishopsgate Cross Route

[A3] King William Street (EC3R,EC4R) (City Of London)

  Moderate

From: Saturday 29 August 2015
To: Sunday 04 August 2019

Last updated 14:31 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A3] King William Street (EC3R/EC4R) (northbound) between London Bridge and Arthur Street - Lane one is closed from London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website

  • [A3] Arthur Street (EC3R,EC4R) (All Directions)
  • [A3] King William Street (EC3R,EC4R) (Both Directions)

Blackwall Tunnel

[A12,A102] Blackwall Tunnel Northern Approach (E14) (Tower Hamlets)

  Moderate

From: Wednesday 13 March 2019
To: Ongoing

Last updated 17:59 Monday 18 March 2019 : Approach with caution. Traffic is flowing well.

Hazard(s) | Burst Water Main

[A12] Blackwall Tunnel Northern Approach (E14) (Northbound) at the junction of St Leonard's Road - There is a burst water main at this location.

Inner Ring

A41

[A41] Baker Street (W1H,W1U,NW1) (Westminster)

  Moderate

From: Monday 24 July 2017
To: Tuesday 30 April 2019

Last updated 14:25 Monday 18 March 2019 : Traffic delays are possible.

Works | Borough

Baker Street two-way scheme, [A41] Baker Street and [A41] Gloucester Place (All Directions) between [A41] Park Road and [A41] Portman Square - Baker Street and Gloucester Place are now operating with two way traffic. Baker Street (northern and southern sections) will be closed to traffic nightly, from Sunday 24 March to Thursday 28 March, inclusive, 2200hrs to 0500hrs, in addition to Marylebone Road reduced to one lane in both directions.

  • A501 (W1H,W1U,NW1) (All Directions)
  • Allsop Place (NW1) (All Directions)
  • [A41] Baker Street (W1H,W1U,NW1) (All Directions)
  • Baker Street (NW1) (Southbound)
  • Bickenhall Street (W1U) (All Directions)
  • Blandford Street (W1U) (All Directions)
  • Chagford Street (NW1) (All Directions)
  • Clarence Terrace (NW1) (All Directions)
  • Clay Street (W1U) (All Directions)
  • Crawford Street (W1H,W1U) (All Directions)
  • Dorset Close (NW1) (All Directions)
  • Dorset Square (NW1) (All Directions)
  • Dorset Street (W1U) (All Directions)
  • Durweston Mews (W1U) (All Directions)
  • Fitzhardinge Street (W1U) (All Directions)
  • George Street (W1H,W1U) (All Directions)
  • Glentworth Street (NW1) (All Directions)
  • [A41] Gloucester Place (W1H,W1U,NW1) (Northbound)
  • Gloucester Place Mews (W1U) (All Directions)
  • Huntsworth Mews (NW1) (All Directions)
  • Ivor Place (NW1) (All Directions)
  • Linhope Street (NW1) (All Directions)
  • Melcombe Street (NW1) (All Directions)
  • Montagu Mansions (W1U) (All Directions)
  • Montagu Place (W1H,W1U) (All Directions)
  • Montagu Row (W1U) (All Directions)
  • Outer Circle (NW1) (All Directions)
  • [B524] Paddington Street (W1U) (All Directions)
  • [A41] Park Road (W1H,W1U,NW1) (Southbound)
  • Porter Street (W1U) (All Directions)
  • Portman Close (W1U,W1H) (All Directions)
  • [A41] Portman Square (W1H,W1U,NW1) (All Directions)
  • [A5204] Portman Square (W1H) (All Directions)
  • Robert Adam Street (W1U) (All Directions)
  • Rodmarton Street (W1U) (All Directions)
  • Rossmore Road (NW1) (All Directions)
  • Salisbury Place (W1H) (All Directions)
  • Seymour Mews (W1H) (All Directions)
  • Siddons Lane (NW1) (All Directions)
  • Spring Mews (W1U) (All Directions)
  • Sussex Place (NW1) (All Directions)
  • Taunton Place (NW1) (All Directions)
  • Upper Berkeley Street (W1H) (All Directions)
  • [A41] York Street (W1H,W1U,NW1) (All Directions)
  • York Street (W1U) (All Directions)

Inner Ring

[A400] Tottenham Court Road (NW1,WC2H,W1T) (Camden,Westminster)

  Moderate

From: Monday 05 March 2018
To: Tuesday 31 March 2020

Last updated 14:31 Monday 18 March 2019 : Delays are possible.

Works | Other

The West End Project, [A400] Tottenham Court Road (W1T) (Northbound) between Oxford Street and Euston Road - Various lane closures and temporary signals in place due to "The West End Project". Temporary traffic signals are operating at St Giles Circus. Monday 18 March until Monday 11 April, inclusive, reduced to a single lane, at times, during road resurfacing works. Expected to switch to two-way traffic over the Easter weekend, Friday 19 to Monday 22 April. More information on Camden council's website.

  • A40 (WC1A,W1D) (All Directions)
  • A400 (NW1,WC2H,W1T) (All Directions)
  • [A400] Charing Cross Road (NW1,WC2H,W1T) (All Directions)
  • [A400] Euston Road (NW1,WC2H,W1T) (All Directions)
  • [A501] Euston Road (NW1) (All Directions)
  • [A400] Hampstead Road (NW1,WC2H,W1T) (All Directions)
  • [A400] Tottenham Court Road (NW1,WC2H,W1T) (Northbound)

Western Cross Route

[A3212] Chelsea Embankment (SW11,SW1W,SW3) (Westminster,Kensington & Chelsea)

  Moderate

From: Monday 23 July 2018
To: Wednesday 20 July 2022

Last updated 14:28 Monday 18 March 2019 : Delays are possible

Works | Utility

Tideway Tunnel Project, [A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions during Tideway Tunnel Project works. A new road layout in place, which remains for the duration of the works. Additionally, Friday 1 March between approximately 2200hrs and 0500hrs temporary traffic signals in operation. More information on the Thames Tideway website.

  • A3216 (SW11,SW1W,SW3) (All Directions)
  • [A3212] Chelsea Embankment (SW11,SW1W,SW3) (All Directions)
  • Chelsea Embankment (SW3) (Both Directions)
  • Embankment Gardens (SW3) (All Directions)
  • [A3212] Grosvenor Road (SW11,SW1W,SW3) (All Directions)

[A40] New Oxford Street (WC1A) (Camden)

  Moderate

From: Monday 04 February 2019
To: Thursday 07 November 2019

Last updated 14:27 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A40] New Oxford Street (WC1A) (Eastbound) at the junction of Museum Street - Lane one (of two) is restricted due to works on behalf of Camden council related to the "West End Project". More information on Camden council's website.

  • [A40] Bloomsbury Way (WC1A) (All Directions)
  • Museum Street (WC1A) (All Directions)
  • [A40] New Oxford Street (WC1A) (All Directions)
  • New Oxford Street (WC1A) (All Directions)

[A104] Whipps Cross Roundabout (E17,E11) (Waltham Forest)

  Moderate

From: Thursday 05 October 2017
To: Sunday 31 March 2019

Last updated 15:02 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A104] Whipps Cross Roundabout (All Directions) - Various restrictions and temporary signals in place as part of a carriageway widening and resurfacing scheme for Waltham Forest Borough Council. The roundabout has been replaced by a 'T' junction.

  • [A104] Lea Bridge Road (E17,E11) (All Directions)
  • [A104] Whipps Cross Roundabout (E17,E11) (All Directions)
  • [B160] Wood Street (E17) (All Directions)

[A308] Kingston Vale (KT2,SW15) (Kingston Upon Thames)

  Moderate

From: Monday 01 October 2018
To: Sunday 01 March 2020

Last updated 15:41 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A308] Kingston Vale (SW15) (Both Directions) at the junction of Robin Hood Place - There are various lane closures and temporary traffic lights in operation due to works for the Go Cycle/Mini Holland cycle lane scheme.

  • Cedar Close (SW15) (All Directions)
  • Constance Close (SW15) (All Directions)
  • Derwent Avenue (SW15) (All Directions)
  • [A308] Kingston Hill (KT2,SW15) (All Directions)
  • Kingston Hill Place (KT2) (All Directions)
  • Ullswater Close (SW15) (All Directions)

[A217] Garratt Lane (SW18) (Wandsworth)

  Moderate

From: Monday 11 March 2019
To: Tuesday 19 March 2019

Last updated 15:43 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A217] Garratt Lane (SW18) (All Directions) at the junction of Thorndean Street - Temporary signals are operating for utility works.

  • Isis Street (SW18) (All Directions)
  • Thorndean Street (SW18) (All Directions)
  • Waynflete Street (SW18) (All Directions)

[A1010] Fore Street (N9) (Enfield)

  Moderate

From: Tuesday 05 February 2019
To: Friday 29 March 2019

Last updated 14:41 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A1010] Fore Street (Both Directions) between Smythe Close and Sebastopol Road - Restrictions, including temporary traffic signals at times, during works related to the Cycle Enfield scheme. Additionally, closures between approximately 2100hrs and 0500hrs each night until Thursday 28 March, inclusive.

[B300] Baylis Road (SE1) (Lambeth)

  Moderate

From: Monday 18 February 2019
To: Wednesday 20 March 2019

Last updated 20:02 Monday 18 March 2019 : There are no reported delays.

Works | TfL

[B300] Baylis Road (SE1) (Northbound) at the junction of Waterloo Road - The carriageway is restricted for cycle lane works. Between the 17th and 20th March there will be a nightly (8pm-7am) northbound road closure for traffic exiting Baylis Road.

  • [A301] Waterloo Road (SE1) (All Directions)

[A206] Trafalgar Road (SE10) (Greenwich)

  Moderate

From: Monday 25 February 2019
To: Thursday 30 May 2019

Last updated 15:02 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A206] Trafalgar Road (Both Directions) between Blackwall Lane and Christchurch Way - Various restrictions in place to facilitate the Low Emission Neighbourhood Trafalgar Road Improvement Scheme. The cycle lane is closed westbound near Vanbrugh Hill and Christchurch Way.

  • [A2203] Blackwall Lane (SE10) (All Directions)
  • [A206] Trafalgar Road (SE10) (Both Directions)
  • [A206] Woolwich Road (SE10) (All Directions)

[A307] Wheatfield Way (KT1) (Kingston Upon Thames)

  Moderate

From: Sunday 21 January 2018
To: Monday 11 November 2019

Last updated 14:33 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A307] Wheatfield Way (All Directions) at the junction of College Roundabout (Kingston) - Various lane closures and restrictions between College Roundabout and Orchard Road for the 'Mini-Holland' scheme.

  • [A307] College Roundabout (Kingston) (KT1) (All Directions)
  • [A307] Kingston Hall Road (KT1) (All Directions)

[A1112] Rainham Road South (RM13,RM10) (Havering,Barking & Dagenham)

  Moderate

From: Tuesday 05 March 2019
To: Friday 05 July 2019

Last updated 14:58 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A1112] Rainham Road South (Both Directions) between Dagenham Road and Reede Road - Various restrictions and temporary signals in place for the duration of the works.

  • Rainham Road South (RM10) (All Directions)
  • [A1112] Rainham Road South Roundabout (RM13,RM10) (All Directions)

[A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Waltham Forest,Hackney)

  Moderate

From: Friday 08 January 2016
To: Friday 29 March 2019

Last updated 21:37 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Various restrictions for Mini-Holland cycle scheme works. Temporary traffic signals are currently in operation at the Argall Way / Orient Way junction. More information on the Mini-Holland schemes.

  • A1006 (E17 ,E10) (All Directions)
  • A107 (E5) (All Directions)
  • A112 (E17 ,E10) (All Directions)
  • Albany Road (E10) (All Directions)
  • Argall Way (E10) (All Directions)
  • Avondale Road (E10) (All Directions)
  • Belvedere Road (E10) (All Directions)
  • Bickley Road (E10) (All Directions)
  • Bloxhall Road (E10) (All Directions)
  • Blyth Road (E17) (All Directions)
  • Bromley Road (E10) (All Directions)
  • Brooke Road (E5) (All Directions)
  • Burwell Road (E10) (All Directions)
  • Butterfields (E17) (All Directions)
  • Chatsworth Road (E5) (All Directions)
  • College Road (E17) (All Directions)
  • Connaught Close (E10) (All Directions)
  • Copeland Road (E10) (All Directions)
  • Cornthwaite Road (E5) (All Directions)
  • Dagenham Road (E10) (All Directions)
  • Dunton Road (E10) (All Directions)
  • Eastern Road (E17) (All Directions)
  • Elm Park Road (E10) (All Directions)
  • Essex Road (E17 ,E10) (All Directions)
  • Ferndale Avenue (E17) (All Directions)
  • Flempton Road (E10) (All Directions)
  • Forest Rise (E17) (All Directions)
  • Foresters Drive (E17) (All Directions)
  • Fraser Road (E10) (All Directions)
  • Gloucester Mews (E10) (All Directions)
  • Gloucester Road (E10) (All Directions)
  • Grove Road (E17) (All Directions)
  • Halford Road (E17) (All Directions)
  • Heybridge Way (E10) (All Directions)
  • Hibbert Road (E17) (All Directions)
  • Hillstowe Street (E5) (All Directions)
  • Hitcham Road (E10) (All Directions)
  • Kenninghall Road (E5) (All Directions)
  • Kettlebaston Road (E10) (All Directions)
  • Knotts Green Road (E10) (All Directions)
  • Lammas Road (E10) (All Directions)
  • [A104] Lea Bridge Road (E17 ,E11 ,E10 ,E5) (Both Directions)
  • Lea Bridge Road (E17 ,E10) (All Directions)
  • [B159] Leyton Green Road (E10) (All Directions)
  • Manor Road (E10) (All Directions)
  • Melbourne Road (E10) (All Directions)
  • Merton Road (E17) (All Directions)
  • Millicent Road (E10) (All Directions)
  • Morieux Road (E10) (All Directions)
  • Northumberland Road (E17) (All Directions)
  • Oakhurst Gardens (E17) (All Directions)
  • Onra Road (E10) (All Directions)
  • Orient Way (E10) (All Directions)
  • Otley Terrace (E5) (All Directions)
  • Perth Road (E10) (All Directions)
  • Peterborough Road (E17) (All Directions)
  • Poplars Road (E17) (All Directions)
  • Prout Road (E5) (All Directions)
  • Raglan Road (E17) (All Directions)
  • Rigg Approach (E10) (All Directions)
  • Rochdale Road (E17) (All Directions)
  • Russell Road (E10) (All Directions)
  • Salcombe Road (E17) (All Directions)
  • Sanderstead Road (E10) (All Directions)
  • School Nook (E5) (All Directions)
  • Seymour Road (E10) (All Directions)
  • Shernhall Street (E17) (All Directions)
  • Shortlands Road (E10) (All Directions)
  • Shrubland Road (E10) (All Directions)
  • Snaresbrook Road (E11) (All Directions)
  • St Peter's Avenue (E17) (All Directions)
  • Stanley Road (E10) (All Directions)
  • Theobald Road (E10) (All Directions)
  • Vicarage Road (E10) (All Directions)
  • Waterworks Lane (E5) (All Directions)
  • Wattisfield Road (E5) (All Directions)
  • West End Avenue (E10) (All Directions)
  • Westerham Road (E10) (All Directions)
  • Western Road (E17) (All Directions)
  • [A104] Whipps Cross Roundabout (E17 ,E11 ,E10 ,E5) (All Directions)
  • Whitney Road (E10) (All Directions)
  • [B160] Wood Street (E17) (All Directions)
  • [A104] Woodford New Road (E17 ,E11 ,E10 ,E5) (All Directions)
  • Woodside Park Avenue (E17) (All Directions)

[A3213] Belgrave Road (SW1V) (Westminster)

  Moderate

From: Monday 18 March 2019
To: Friday 22 March 2019

Last updated 21:02 Monday 18 March 2019 : Expect delays on approach.

Works | Emergency

[A3213] Belgrave Road (All Approaches) at the junction of Warwick Square - There are temporary traffic lights in place due to a burst water main.

  • [A3213] Belgrave Road (SW1V) (All Approaches)
  • Guildhouse Street (SW1V) (All Directions)
  • [A3213] Warwick Square (SW1V) (All Directions)
  • Warwick Square Mews (SW1V) (All Directions)
  • Warwick Way (SW1V) (All Directions)

Vauxhall Bridge

  Moderate

Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021

Last updated 15:58 Tuesday 12 March 2019

Works | TfL Works

Vauxhall Bridge, Bridg - Repainting and waterproofing

[A40] Oxford Street (WC2H,WC1A,W1D) (Camden,Westminster)

  Moderate

From: Monday 30 April 2018
To: Friday 31 May 2019

Last updated 14:32 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

[A40] Oxford Street (W1) (Both Directions) between [A400] Tottenham Court Road (St Giles Circus) and Rathbone Place - Various closures for a new development in the area. There are currently restrictions in place westbound.

  • Bainbridge Street (WC1A) (All Directions)
  • Gresse Street (W1T) (All Directions)
  • [A40] New Oxford Street (WC2H,WC1A,W1D) (All Directions)
  • [A40] Oxford Street (WC2H,WC1A,W1D) (Both Directions)
  • Rathbone Place (W1T) (All Directions)
  • Soho Square (W1D) (All Directions)
  • Soho Street (W1D) (All Directions)
  • Sutton Row (W1D) (All Directions)

[A232] Duppas Hill Road (CR0) (Croydon)

  Moderate

From: Monday 18 March 2019
To: Ongoing

Last updated 19:19 Monday 18 March 2019 : Traffic is flowing well.

Works | Emergency

[A232] Duppas Hill Road (CR0) (Both Directions) at the junction of Glen Gardens - Temporary signals in operation due to a burst water main.

  • [A232] Duppas Hill Road (CR0) (Both Directions)
  • Glen Gardens (CR0) (All Directions)

[A215] Denmark Hill (SE5) (Lambeth,Southwark)

  Moderate

From: Monday 07 January 2019
To: Sunday 07 July 2019

Last updated 15:37 Monday 18 March 2019 : Delays are possible.

Works | Other

Camberwell Town Centre Scheme, [A215] Denmark Hill (SE5) (Both Directions) between Orpheus Street and Ashworth Close - Various restrictions in place for the Camberwell Town Centre Scheme works.

  • Ashworth Close (SE5) (All Directions)
  • [A2217] Coldharbour Lane (SE5) (All Directions)
  • [A215] Denmark Hill (SE5) (Both Directions)
  • Milkwell Yard (SE5) (All Directions)

[A244] Hounslow Road (TW14,TW13) (Hounslow)

  Moderate

From: Tuesday 29 May 2018
To: Monday 02 September 2019

Last updated 14:49 Monday 18 March 2019 : Delays are possible.

Works | Other

[A244] Hounslow Road (TW14/TW13) (Both Directions) between New Road and [B3377] Hanworth Road - Single alternate lane traffic with temporary traffic signals in operation for collaborative works on behalf of Network Rail and Hounslow council. More information is available on the Hounslow's website.

  • B3377 (TW14,TW13) (All Directions)

[A2212] Baring Road (SE12) (Lewisham)

  Moderate

From: Monday 18 June 2018
To: Saturday 30 March 2019

Last updated 15:00 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A2212] Baring Road (SE12) (All Directions) between Downham Way and Chinbrook Road - Carriageway restrictions and temporary signals are in place due to public realm redevelopment works.

  • [A2212] Baring Road (SE12) (All Directions)
  • Galahad Road (BR1) (All Directions)

[A1010] Hertford Road (N9) (Enfield)

  Moderate

From: Thursday 31 January 2019
To: Friday 22 March 2019

Last updated 14:40 Monday 18 March 2019 : No reported delays,

Works | Borough

Mini Holland Cycle Scheme, [A1010] Hertford Road (N9) (All Directions) at the junction of Bounces Road - Temporary traffic signals are in operation. Bury Street and Rosemary Avenue are closed.

  • Croyland Road (N9) (All Directions)
  • [A1010] Hertford Road (N9) (All Directions)

[A305,A311] The Green (TW2) (Richmond Upon Thames)

  Moderate

From: Monday 18 March 2019
To: Friday 22 March 2019

Last updated 19:18 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A311] The Green (TW2) (All Directions) at the junction of Knowle Road and Heath Road - There are temporary traffic lights in place due to emergency Thames Water works.

  • Knowle Road (TW2) (All Directions)
  • The Green (All Directions)
  • [A305,A311] The Green (TW2) (All Directions)

Victoria Street ()

  Moderate

From: Tuesday 03 May 2011
To: Sunday 07 April 2019

Last updated 08:17 Monday 18 March 2019 : Delays are possible.

Works | TfL

Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road. Find out more..

A10

[A503] Monument Way (N17,N15) (Haringey)

  Minimal

From: Monday 04 March 2019
To: Sunday 18 August 2019

Last updated 14:44 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A503] Monument Way (N17/N15) (Eastbound) at the junction of The Hale - Lane one (of three) is closed due to works.

  • Fairbanks Road (N17) (All Directions)
  • Hale Gardens (N17) (All Directions)
  • [A503] Hale Road (N17,N15) (All Directions)
  • High Cross Road (N17) (All Directions)
  • [A10] High Road (N17,N15) (All Directions)
  • [A503] Monument Way (N17,N15) (Eastbound)
  • Stainby Road (N17,N15) (All Directions)
  • The Hale (All Directions)
  • [A1055] The Hale (N17) (All Directions)

A10

[A1055] Watermead Way (N17) (Haringey)

  Minimal

From: Monday 14 January 2019
To: Thursday 31 October 2019

Last updated 14:49 Monday 18 March 2019 : Delays are possible.

Works | Borough

[A1055] Watermead Way (N17) (All Directions) at the junction of Hale Road and The Hale and Ferry Lane and Monument Way - Various lane restrictions and phased closures for a major Borough Highway Scheme.

  • Ashley Road (N17) (All Directions)
  • Cygnet Way (N17) (All Directions)
  • High Cross Road (N17) (All Directions)
  • Lebus Street (N17) (All Directions)
  • Montague Road (N15) (All Directions)
  • Station Road (N17) (All Directions)
  • The Hale (N17) (All Directions)

A10

[A10] High Road (N15) (Haringey)

  Minimal

From: Monday 18 March 2019
To: Ongoing

Last updated 21:29 Monday 18 March 2019 : Approach with caution.

Hazard(s) | Collapsed Manhole

[A10] High Road (N15) (All Directions) at the junction of Town Hall Approach Road - Carriageway is partially restricted due to a collapsed man hole cover.

  • [A10] High Road (N15) (All Directions)
  • Tottenham Green East South Side (N15) (All Directions)

A205

[A205] Academy Road (SE18) (Greenwich)

  Minimal

From: Monday 18 March 2019
To: Saturday 23 March 2019

Last updated 19:08 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A205] Academy Road (SE18) (Southbound) at the junction of Academy Place - There will be a lane one closure in place due to BT works.

  • Academy Place (SE18) (All Directions)
  • [A205] Academy Road (SE18) (Southbound)

A205

[A205] Westhorne Avenue (SE12) (Lewisham,Greenwich)

  Minimal

From: Sunday 17 March 2019
To: Ongoing

Last updated 19:09 Monday 18 March 2019 : Approach with caution.

Hazard(s) | Burst Water Main

[A205] Westhorne Avenue (SE12) (All Directions) at the junction of Woodyates Road - Burst water main at location.

  • Horncastle Close (SE12) (All Directions)
  • [A205] St Mildreds Road (SE12) (All Directions)
  • Wildwood Close (SE12) (All Directions)
  • Woodyates Road (SE12) (All Directions)

A21

[A21] Lewisham High Street (SE6,SE13) (Lewisham)

  Minimal

From: Friday 11 January 2019
To: Saturday 06 April 2019

Last updated 15:40 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A21] Lewisham High Street (SE13) (All Directions) between Rushey Green and Ladywell Road - The carriageway will be restricted between 07:00-19:00 Mon-Fri and 08:00-17:00 Sat and Sunday for utility work.

  • George Lane (SE13) (All Directions)
  • [B236] Ladywell Road (SE13) (All Directions)
  • [A21] Lewisham High Street (SE6,SE13) (All Directions)
  • Mount Pleasant Road (SE13) (All Directions)

A21

[A21] Hastings Road (BR2) (Bromley)

  Minimal

From: Monday 11 March 2019
To: Thursday 21 March 2019

Last updated 19:44 Monday 18 March 2019 : No reported delays.

Works | TfL

[A21] Hastings Road and [A21] Bromley Common (BR2) (Both Directions) between Knowle Road and Magpie Hall Lane - Temporary signals will operate single file traffic for resurfacing between1930hrs and 0500hrs.

  • Brewery Road (BR2) (All Directions)
  • [A21] Bromley Common (BR2) (All Directions)
  • Cherry Orchard Road (BR2) (All Directions)
  • Church Lane (BR2) (All Directions)
  • Gravel Road (BR2) (All Directions)
  • [A21] Hastings Road (BR2) (All Directions)
  • Hastings Road (BR2) (Both Directions)
  • Jackson Road (BR2) (All Directions)
  • Knowle Road (BR2) (All Directions)
  • Lower Gravel Road (BR2) (All Directions)
  • Magpie Hall Lane (BR2) (All Directions)
  • [A233] Oakley Road (BR2) (All Directions)
  • Osprey Close (BR2) (All Directions)
  • Trinity Close (BR2) (All Directions)
  • Turpington Lane (BR2) (All Directions)

A21

[A21] Bromley Road (SE6) (Lewisham)

  Minimal

From: Monday 11 February 2019
To: Friday 22 March 2019

Last updated 14:48 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A21] Bromley Road (SE6) (Both Directions) at the junction of Crantock Road - Temporary traffic signals in use during junction improvement works. The junction will be reduced to one lane on all approaches on Wednesday 20th March between midnight and 0500hrs.

  • Aitken Road (SE6) (All Directions)
  • Charsley Road (SE6) (All Directions)
  • Newquay Road (SE6) (All Directions)

A23

[A23] Streatham High Road (SW16) (Lambeth)

  Minimal

From: Monday 18 March 2019
To: Thursday 21 March 2019

Last updated 19:17 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A23] Streatham High Road (SW16) (Northbound) at the junction of Glencairn Road - Lane one (bus lane) (of two) closed during Thames Water works.

  • Arragon Gardens (SW16) (All Directions)
  • Baldry Gardens (SW16) (All Directions)
  • Colmer Road (SW16) (All Directions)
  • Glencairn Road (SW16) (All Directions)
  • [B273] Green Lane (SW16) (All Directions)
  • Guildersfield Road (SW16) (All Directions)
  • Heathdene Road (SW16) (All Directions)
  • Hepworth Road (SW16) (All Directions)
  • Heybridge Avenue (SW16) (All Directions)
  • Hilldown Road (SW16) (All Directions)
  • Penistone Road (SW16) (All Directions)
  • Rochester Close (SW16) (All Directions)
  • St Leonard's Walk (SW16) (All Directions)
  • [A23] Streatham High Road (SW16) (Northbound)

A23

[A23] Brixton Road (SW9) (Lambeth)

  Minimal

From: Monday 04 March 2019
To: Sunday 30 June 2019

Last updated 15:09 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A23] Brixton Road (SW9) (Both Directions) between Lorn Road and Hillyard Street - The northbound carriageway is closed due to the works and a contraflow is in operation via the southbound carriageway. A temporary 20mph speed limit is in force.

  • Groveway (SW9) (All Directions)
  • Hillyard Street (SW9) (All Directions)

A23

[A23] Kennington Road (SE11) (Lambeth)

  Minimal

From: Thursday 03 August 2017
To: Thursday 26 September 2019

Last updated 14:30 Monday 18 March 2019 : Delays are possible on the approach.

Works | TfL

[A23] Kennington Road (SE11) (Northbound) at the junction of Clayton Street - The road has been reduced to one lane in both directions for London Underground upgrade works.

  • Clayton Street (SE11) (All Directions)
  • [A23] Kennington Road (SE11) (Northbound)

A24

[A24] Balham High Road (SW17) (Wandsworth)

  Minimal

From: Thursday 06 September 2018
To: Monday 30 September 2019

Last updated 14:48 Monday 18 March 2019 : Delays are possible.

Works | Other

[A24] Balham High Road (SW17) (Both Directions) at the junction of Upper Tooting Park - The parking bays are restricted for works. From 0800hrs Tuesday 2 until 1700hrs Friday 5 April, reduced to a single lane southbound.

  • [A24] Balham High Road (SW17) (Northbound)
  • Upper Tooting Park (SW17) (All Directions)

A3

[A3205] Nine Elms Lane (SW8,SW11) (Wandsworth)

  Minimal

From: Monday 18 March 2019
To: Monday 03 June 2019

Last updated 19:22 Monday 18 March 2019 : No restrictions in place at present.

Works | TfL

[A3205] Nine Elms Lane (Both Directions) at the junction of Cringle Street - Lane restrictions during junction improvement works on behalf of the borough of Wandsworth.

  • Cringle Street (SW11) (All Directions)

A3

[A3205] Nine Elms Lane (SW11,SW8) (Wandsworth)

  Minimal

From: Monday 04 February 2019
To: Tuesday 26 March 2019

Last updated 15:31 Monday 18 March 2019 : Delays are possible

Works | TfL

[A3205] Nine Elms Lane (SW11/SW8) (All Directions) at the junction of Ponton Road - Various lane closures in place for Thames Tideway Works. Sunday 24 February, single alternate lane working under temporary traffic signal control between approximately 2200hrs and 0500hrs.

  • [A3205] Nine Elms Lane (SW11,SW8) (All Directions)

A3

[A3205] Nine Elms Lane (SW8,SW11) (Wandsworth)

  Minimal

From: Saturday 02 February 2019
To: Friday 22 March 2019

Last updated 15:37 Monday 18 March 2019 : Delays are possible.

Works | Utility

A3205] Nine Elms Lane (SW8/SW11) (Both Directions) at the junction of Ponton Road - Lane restrictions in place for Cadent Gas works.

  • [A3205] Nine Elms Lane (SW8,SW11) (Both Directions)
  • Nine Elms Lane (All Directions)
  • Ponton Road (SW11) (All Directions)

A3

[A3205] Prince Of Wales Drive (SW8) (Wandsworth)

  Minimal

From: Tuesday 05 June 2018
To: Monday 01 April 2019

Last updated 14:35 Monday 18 March 2019 : Delays are possible.

Works | Other

Prince Of Wales Drive (SW8) (Both Directions) between Battersea Park Road and Queenstown Road - Pavement closures implemented when necessary due to construction work. Possible carriageway restrictions to maintain pedestrian access at times.

  • Bradmead (SW8) (All Directions)
  • Havelock Terrace (SW8) (All Directions)
  • Palmerston Way (SW8) (All Directions)
  • Prince Of Wales Drive (SW8) (Both Directions)

A4

[A4] Knightsbridge (SW1X) (Westminster)

  Minimal

From: Tuesday 03 May 2016
To: Tuesday 30 April 2019

Last updated 14:26 Monday 18 March 2019 : Traffic congestion is possible.

Works | Borough

[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - The carriageway will be restricted at various times until April 2019 for the redevelopment of 55-91 Knightsbridge. The westbound bus lane is closed until April 2019. Additionally, the bus lane is closed from Old Barrack Yard to William Street until 30/09/19 during the redevelopment of the Berkeley Hotel. More information available on Westminster council's website.

  • [A4] Knightsbridge (SW1X) (Westbound)
  • Wilton Place (SW1X) (Both Directions)

A4

Western Cross Route

[A3220] Pembroke Road (W8,W14,SW5) (Kensington & Chelsea)

  Minimal

From: Monday 18 February 2019
To: Saturday 23 March 2019

Last updated 14:25 Monday 18 March 2019 : Traffic delays are possible.

Works | Borough

[A3220] Pembroke Road (W14) (Eastbound) at the junction of [A3220] Earl's Court Road (Southbound) - Lane restrictions during junction improvement works on behalf of Kensington & Chelsea council.

  • A4 (SW5) (All Directions)
  • Cromwell Crescent (W8,SW5) (All Directions)
  • [A3220] Earl's Court Road (W8,W14,SW5) (All Directions)
  • [B316] Earl's Court Road (W8) (All Directions)
  • Lexham Gardens (W8) (All Directions)
  • Logan Place (W8) (All Directions)
  • Pembroke Gardens (W8) (All Directions)
  • [B316] Pembroke Road (W8) (Eastbound)
  • [A3220] Pembroke Road (W8,W14,SW5) (All Directions)
  • Pembroke Villas (W8) (All Directions)
  • Pembroke Walk (W8) (All Directions)
  • [A3220] Warwick Gardens (W8,W14,SW5) (All Directions)

A40

Western Cross Route

[A40] Western Avenue (W3,W10,W12) (Hammersmith & Fulham,Ealing,Kensington & Chelsea)

  Minimal

From: Monday 18 March 2019
To: Tuesday 31 December 2019

Last updated 14:47 Monday 18 March 2019 : Traffic is flowing well.

Works | TfL

Cycle route Wood Lane to Acton, [A40] Western Avenue (Westbound) between [A219] Wood Lane (White City) and Gypsy Corner (A4000) - Works are expected to be off-carriageway until approximately Monday 8 April, after which lane one (of three) is expected to be closed until approximately late 2019 during the construction of the new cycle route. More information on the new cycle route.

  • A3220 (W10) (All Directions)
  • A40 (W3,W10,W12) (All Directions)
  • A4000 (W3) (All Directions)
  • Allan Way (W3) (All Directions)
  • Alliance Road (W3) (All Directions)
  • Anderson Close (W3) (All Directions)
  • Banstead Court (W12) (All Directions)
  • Bennelong Close (W12) (All Directions)
  • Bloemfontein Road (W12) (All Directions)
  • Carlisle Avenue (W3) (All Directions)
  • Charlotte Mews (W10) (All Directions)
  • Cotton Avenue (W3) (All Directions)
  • Court Way (W3) (All Directions)
  • Crowthorne Road (W10) (All Directions)
  • Darfield Way (W10) (All Directions)
  • Friary Road (W3) (All Directions)
  • Gibbon Road (W3) (All Directions)
  • Glendun Road (W3) (All Directions)
  • Hilary Road (W12) (All Directions)
  • Joslings Close (W12) (All Directions)
  • Kingsdown Avenue (W3) (All Directions)
  • Lilac Street (W12) (All Directions)
  • Mansfield Road (W3) (All Directions)
  • Maurice Street (W12) (All Directions)
  • Old Oak Road (W12) (All Directions)
  • [B4492] Park Royal Road (W3) (All Directions)
  • Perryn Road (W3) (All Directions)
  • Primula Street (W12) (All Directions)
  • Rosebank Way (W3) (All Directions)
  • [A40] Savoy Circus (W3,W10,W12) (All Directions)
  • Savoy Circus (W3,W12) (All Directions)
  • Sundew Avenue (W12) (All Directions)
  • Sunningdale Avenue (W3) (All Directions)
  • Templemead Close (W3) (All Directions)
  • Terrick Street (W12) (All Directions)
  • The Curve (W12) (All Directions)
  • Western Avenue (W3) (Westbound)
  • [A40] Westway (W3,W10,W12) (All Directions)
  • Westway (W12) (All Directions)
  • [A219,A40] Wood Lane (W12) (All Directions)
  • York Road (W3) (All Directions)

A406

[A406] Fore Street Tunnel (N18) (Enfield)

  Minimal

From: Monday 18 March 2019
To: Ongoing

Last updated 21:11 Monday 18 March 2019 : Traffic is flowing well.

Traffic Incidents | Collision

[A406] Fore Street Tunnel (N18) (Eastbound) - All lanes have reopened following an earlier collision.

  • [A406] Fore Street Tunnel (N18) (Eastbound)
  • [A406] Sterling Way (N18) (All Directions)

A406

A4

[A406] Gunnersbury Avenue (NORTH CIRCULAR ROAD) (W4,W3) (Hounslow)

  Minimal

From: Monday 21 January 2019
To: Wednesday 31 July 2019

Last updated 14:50 Monday 18 March 2019 : Delays are possible.

Works | TfL

Gunnersbury Avenue safety scheme, [A406] Gunnersbury Avenue (North Circular Road) (W3) (Both Directions) near the junction of Manor Gardens by Kensington Cemetery - Various lane restrictions during works related to the Gunnersbury Avenue safety scheme. Reduced to one lane northbound and two lanes southbound until approximately Sunday 17 March. Sunday 17 March until approximately early May, reduced to a single lane in both directions. Additionally, from approximately Friday 29 March, no right-turn when exiting side roads onto the [A406] between Park Place and Power Road. This is permanent change. More information.

  • A4 (W4) (All Directions)
  • [M4] Chiswick Flyover (M4) (TW8,W4) (All Directions)
  • Manor Gardens (W3) (All Directions)
  • Park Place (W3) (All Directions)

A41

[A41] Park Road (NW1,NW8) (Westminster)

  Minimal

From: Friday 15 March 2019
To: Sunday 24 March 2019

Last updated 21:09 Monday 18 March 2019 : There are no reported delays.

Works | Utility

[A41] Park Road (NW1) (Southbound) after the junction of Hanover Gate - Lane one (of two) closed during Cadent Gas works.

  • Alpha Close (NW8) (All Directions)
  • Hanover Gate (NW8,NW1) (All Directions)
  • Kent Terrace (NW1) (All Directions)
  • Lorne Close (NW8) (All Directions)
  • [A41] Park Road (NW1,NW8) (Southbound)

A41

A406

[A41] Hendon Way (NW4) (Barnet)

  Minimal

From: Monday 18 March 2019
To: Tuesday 19 March 2019

Last updated 21:02 Monday 18 March 2019 : There are no reported delays.

Works | Utility

[A41] Hendon Way (NW4) (Southbound) at the junction of Beaufort Gardens - Lane three (of three) closed between approximately 2100hrs and 0500hrs during overnight BT works.

  • [A41] Brent Cross Flyover (A41) (NW4) (All Directions)
  • Central Circus (NW4) (All Directions)
  • [A41] Central Circus (NW4) (All Directions)
  • Denehurst Gardens (NW4) (All Directions)
  • Elliot Road (NW4) (All Directions)
  • Graham Road (NW4) (All Directions)
  • Haley Road (NW4) (All Directions)
  • [A41] Hendon Way (NW4) (Southbound)
  • Park Road (NW4) (All Directions)
  • Renters Avenue (NW4) (All Directions)
  • Spalding Road (NW4) (All Directions)

Bishopsgate Cross Route

[A10] Bishopsgate (EC2N,EC2M) (City Of London)

  Minimal

From: Monday 26 November 2018
To: Sunday 26 May 2019

Last updated 14:32 Monday 18 March 2019 : Delays are possible.

Works | TfL

[A10] Bishopsgate (EC2N/EC2M) (Both Directions) at the junction of Camomile Street - Various restrictions in use to facilitate junction improvement works. During most phases of the work, the restrictions will be confined to the pavement.

  • A1211 (EC2N,EC2M) (All Directions)
  • [A10] Bishopsgate (EC2N,EC2M) (Both Directions)

Bishopsgate Cross Route

[A10] Bishopsgate (EC3V) (City Of London)

  Minimal

From: Saturday 02 February 2019
To: Monday 03 February 2020

Last updated 14:31 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

[A10] Bishopsgate (EC3V) (Southbound) at the junction of Leadenhall Street - Lane one (of two) is closed to facilitate building works.

  • [A10] Bishopsgate (EC3V) (Southbound)
  • Cornhill (EC3V) (All Directions)
  • Leadenhall Street (EC3V) (All Directions)

Farringdon Cross Route

[A201] Blackfriars Road (SE1) (Southwark)

  Minimal

From: Thursday 14 March 2019
To: Ongoing

Last updated 21:01 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A201] Blackfriars Road (SE1) (Northbound) at the junction of Upper Ground - Lane one (of two) is blocked. The left turn has been banned to facilitate works on Upper Ground to take place.

  • [A201] Blackfriars Road (SE1) (Northbound)
  • Upper Ground (SE1) (All Directions)

Inner Ring

[A501] Pentonville Road (N1) (Islington)

  Minimal

From: Monday 04 February 2019
To: Tuesday 24 December 2019

Last updated 14:27 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

Pentonville Road (N1) (Southbound) at the junction of King's Cross Bridge and Gray's Inn Road - The carriageway will be restricted on Pentonville Road and Gray's Inn Road due to a building development.

  • Kings Cross Bridge (N1) (All Directions)
  • [A501] Pentonville Road (N1) (All Directions)
  • Pentonville Road (N1) (Southbound)
  • St Chad's Place (WC1X) (All Directions)
  • St Chad's Street (WC1H) (All Directions)

Inner Ring

[A501] Pentonville Road (N1) (Islington)

  Minimal

From: Wednesday 06 February 2019
To: Monday 01 April 2019

Last updated 14:32 Monday 18 March 2019 : Expect delays.

Works | Utility

[A501] Pentonville Road (N1) (Eastbound) between Penton Street and [A1] Islington High Street (Upper Street) - Lane one (of two) closed during Cadent Gas works.

  • Claremont Square (N1) (All Directions)
  • Penton Street (N1) (All Directions)
  • [A501] Pentonville Road (N1) (Eastbound)

Inner Ring

[A4202] Park Lane (W1J,W1K,W2) (Westminster)

  Minimal

From: Monday 21 January 2019
To: Friday 29 March 2019

Last updated 14:29 Monday 18 March 2019 : Traffic delays are possible.

Works | Utility

[A4202] Park Lane (W1) (Southbound) between Marble Arch and Hyde Park Corner - There will be a rolling closure of lane one for gas works. Monday 4 until Friday 29 March, inclusive, between Stanhope Gate and Curzon Street.

  • A4 (W1J,W2) (All Directions)
  • [A4202] Achilles Way (W1J,W1K,W2) (All Directions)
  • [A4202] Brook Gate (W1J,W1K,W2) (All Directions)
  • Culross Street (W1K) (All Directions)
  • [A40] Cumberland Gate (W1K,W1C,W2) (All Directions)
  • Curzon Street (W1K) (All Directions)
  • Deanery Street (W1K) (All Directions)
  • Dunraven Street (W1K) (All Directions)
  • Great Cumberland Place (W1C) (All Directions)
  • Green Street (W1K) (All Directions)
  • Hamilton Place (W1J) (All Directions)
  • [A40] Marble Arch (W1K,W1C,W2) (All Directions)
  • Mount Street (W1K) (All Directions)
  • North Row (W1K) (All Directions)
  • [A40] Oxford Street (W1K,W1C,W2) (All Directions)
  • Park Lane (W1J,W1K) (All Directions)
  • [A40] Park Lane (W1K,W1C,W2) (All Directions)
  • [A4202] Park Lane (W1J,W1K,W2) (Southbound)
  • Park Street (W1K) (All Directions)
  • Pitt's Head Mews (W1K) (All Directions)
  • South Carriage Drive (W2) (All Directions)
  • South Street (W1K) (All Directions)
  • Stanhope Gate (W1K) (All Directions)
  • Tilney Street (W1K) (All Directions)
  • Upper Brook Street (W1K) (All Directions)
  • Upper Grosvenor Street (W1K) (All Directions)
  • Wood's Mews (W1K) (All Directions)

Inner Ring

Old Street Roundabout (EC1Y) (Islington,Hackney)

  Minimal

From: Monday 07 January 2019
To: Sunday 28 February 2021

Last updated 14:30 Monday 18 March 2019 : Traffic congestion is possible on the approach.

Works | TfL

Old Street Roundabout (All Directions) - Various restrictions in place during junction improvement works. The subway and ramps between street level on the south-eastern side of the roundabout and Old Street station are closed from approximately Tuesday 7 May. The switch to two-way traffic, once the south-eastern side of the roundabout is closed to traffic, is expected to be complete by late May. More information.

  • City Road (EC1V,EC1Y) (All Directions)
  • City Road (EC1V,EC1Y) (All Directions)
  • Old Street (EC1V,EC1Y) (All Directions)
  • Old Street (EC1V,EC1Y) (All Directions)
  • Old Street Roundabout (EC1Y) (All Directions)
  • Old Street Roundabout (EC1Y) (All Directions)

Inner Ring

A501 (N1,WC1X,NW1) (Camden,Islington)

  Minimal

From: Monday 11 March 2019
To: Wednesday 20 March 2019

Last updated 14:32 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A5200] York Way (N1) (Northbound) between Euston Road and Caledonia Street - The loading bay is partially obstructed by Cadent Gas works.

  • A501 (N1,WC1X,NW1) (All Directions)
  • Birkenhead Street (WC1H) (All Directions)
  • Crestfield Street (WC1H) (All Directions)
  • [A5200] Gray's Inn Road (N1,WC1X) (All Directions)
  • [A5200] York Way (N1,WC1X) (Northbound)

Southern River Route

[A3212] Millbank Roundabout (SW1P) (Westminster)

  Minimal

From: Monday 25 June 2018
To: Monday 13 April 2020

Last updated 14:31 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

[A3212] Millbank Roundabout (SW1) (All Directions) junction with [B323] Horseferry Road and Lambeth Bridge - The carriageway is restricted for construction work.

  • A3203 (SE1,SW1P) (All Directions)
  • Dean Stanley Street (SW1P) (All Directions)
  • [B323] Horseferry Road (SW1P) (All Directions)
  • [A3212] Millbank (SW1P) (Northbound)
  • [A3212] Millbank Roundabout (SW1P) (All Directions)

Western Cross Route

[A3212] Chelsea Embankment (SW3,SW11) (Kensington & Chelsea)

  Minimal

From: Monday 04 February 2019
To: Tuesday 19 March 2019

Last updated 14:33 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A3212] Chelsea Embankment (SW3/SW11) (Eastbound) at the junction of Oakley Street - Footway restrictions due to gas work.

  • [A3212] Chelsea Embankment (SW3,SW11) (Eastbound)
  • [B304] Oakley Street (SW3) (All Directions)
  • [B302] Royal Hospital Road (SW3) (All Directions)

[A40] Oxford Street (W1C,W1K) (Westminster)

  Minimal

From: Monday 18 March 2019
To: Friday 22 March 2019

Last updated 16:41 Monday 18 March 2019 : Approach with caution.

Works | Utility

[A40] Oxford Street (W1C/W1K) (All Directions) at the junction of James Street - Temporary traffic signals are in place for Thames Water works.

  • Binney Street (W1K) (All Directions)

Marsh Wall (E14) (Tower Hamlets)

  Minimal

From: Monday 18 March 2019
To: Wednesday 27 March 2019

Last updated 14:48 Monday 18 March 2019 : Delays are possible.

Works | Utility

Marsh Wall (E14) (All Directions) at the junction of Millharbour - Temporary traffic lights to facilitate Thames Water works.

  • Millharbour (E14) (All Directions)

[A118] Romford Road (E7) (Newham)

  Minimal

From: Monday 18 March 2019
To: Ongoing

Last updated 20:32 Monday 18 March 2019 : Approach with caution.

Hazard(s) | Surface Damage

[A118] Romford Road (E7) (Eastbound) at the junction of Green Street - There is a pot hole in the bus stop at this location.

  • Green Street (All Directions)

[A111] Chase Side (N14) (Enfield)

  Minimal

From: Monday 18 March 2019
To: Tuesday 19 March 2019

Last updated 20:59 Monday 18 March 2019 : There are no reported delays.

Works | Utility

[A111] Chase Side (N14) (All Directions) at the junction of Chelmsford Road - Temporary traffic signals in use to facilitate Virgin Media works.

  • Chelmsford Road (N14) (All Directions)

[A2209] Deptford Church Street (SE8) (Lewisham)

  Minimal

From: Monday 29 October 2018
To: Thursday 23 December 2021

Last updated 15:30 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Bronze Street - Contraflow in place, reducing both directions to one lane, for Thames Tideway works.

  • Bronze Street (SE8) (All Directions)

[A400] Hampstead Road (NW1) (Camden)

  Minimal

From: Sunday 07 October 2018
To: Sunday 31 March 2019

Last updated 14:48 Monday 18 March 2019 : Delays are possible.

Works | Other

[A400] Hampstead Road (NW1) (Both Directions) at the junctions of Granby Terrace and Robert Street- Various restrictions during HS2-related works. Lane one (bus lane) closed in both directions. Additionally, temporary traffic signals in operation at the junction with Granby Terrace. Width restrictions southbound opposite the junction of Robert Street.

  • [A400] Hampstead Road (NW1) (Northbound)

Ridgway (SW19) (Merton)

  Minimal

From: Friday 15 March 2019
To: Wednesday 20 March 2019

Last updated 15:42 Monday 18 March 2019 : Delays are possible.

Works | Emergency

Ridgway (SW19) (Both Directions) at the junction of The Downs - Temporary signals in operation due to a burst water main.

  • Ridgway (SW19) (Both Directions)
  • The Downs (SW20,SW19) (All Directions)

[B402] Long Acre (WC2E,WC2H) (Westminster)

  Minimal

From: Monday 04 March 2019
To: Tuesday 02 April 2019

Last updated 14:28 Monday 18 March 2019 : Delays are possible.

Works | Utility

[B402] Long Acre (WC2E) (Both Directions) between Garrick Street and Bow Street - The road will be closed due to works.

  • Bow Street (WC2E) (All Directions)
  • Garrick Street (WC2E) (All Directions)
  • [B402] Long Acre (WC2E,WC2H) (Both Directions)

[A401] Shaftesbury Avenue (W1J,W1D) (Westminster)

  Minimal

From: Thursday 14 March 2019
To: Wednesday 20 March 2019

Last updated 21:01 Monday 18 March 2019 : Traffic is flowing well on the approach.

Works | Utility

[A401] Shaftesbury Avenue (W1D/W1J) (Eastbound) at the junction of Piccadilly Circus - Lane one (of two) is closed due to works being carried out by UKPN.

  • A4 (W1D) (All Directions)
  • Denman Street (W1D) (All Directions)
  • Great Windmill Street (W1D) (All Directions)
  • [A4,A4201] Piccadilly Circus (W1J,W1B) (All Directions)
  • [A401] Shaftesbury Avenue (W1J,W1D) (Eastbound)

[A222,A214] Croydon Road (BR3) (Bromley)

  Minimal

From: Monday 04 February 2019
To: Wednesday 20 March 2019

Last updated 15:28 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A222] Croydon Road (BR3) (All Directions) at the junction of Eden Park Avenue and Elmerside Road - Two way temporary signals are in operation and Eden Park Avenue is closed for gas main replacement works.

  • A214 (BR3) (All Directions)
  • Balmoral Avenue (BR3) (All Directions)
  • Broomfield Road (BR3) (All Directions)
  • Clock House Road (BR3) (All Directions)
  • Eden Road (BR3) (All Directions)
  • Elmerside Road (BR3) (All Directions)

[A112] High Road Leyton (E10) (Waltham Forest)

  Minimal

From: Monday 04 March 2019
To: Tuesday 19 March 2019

Last updated 15:06 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A112] High Road Leyton (E10) (All Directions) at the junction of Skeltons Lane - Two way temporary signals in operation for utility connection works.

  • Skeltons Lane (E10) (All Directions)

[A5201] Clerkenwell Road (EC1M) (Islington)

  Minimal

From: Monday 24 July 2017
To: Sunday 31 March 2019

Last updated 14:33 Monday 18 March 2019 : Delays are possible.

Works | Other

[A5201] Clerkenwell Road (EC1M) (Both Directions) at the junction of Britton Street - The carriageway is restricted for building works.

  • Britton Street (EC1M) (All Directions)
  • Clerkenwell Green (EC1R) (All Directions)
  • [A5201] Clerkenwell Road (EC1M) (Both Directions)
  • St John's Square (EC1V) (All Directions)
  • Turnmill Street (EC1R,EC1M) (All Directions)

[A400] Charing Cross Road (W1T,WC2H) (Westminster,Camden)

  Minimal

From: Thursday 14 September 2017
To: Thursday 31 December 2020

Last updated 14:29 Monday 18 March 2019 : Delays are possible.

Special and Planned Events | Construction Activity

[A400] Charing Cross Road (WC2H) (Southbound) between Tottenham Court Road Underground Station South Plaza and Denmark Street - The bus lane is closed for the consolidated building development until late into 2020.

  • Goslett Yard (WC2H) (All Directions)
  • Manette Street (W1D) (All Directions)
  • [A400] Tottenham Court Road (W1T,WC2H) (All Directions)

[A105] Green Lanes (N4,N8) (Haringey)

  Minimal

From: Monday 11 March 2019
To: Tuesday 19 March 2019

Last updated 21:00 Monday 18 March 2019 : Traffic is flowing well.

Works | Utility

[A105] Green Lanes (N8/N4) (All Directions) at the junction of St Ann's Road - Lane restrictions in use to facilitate Thames Water works.

  • B152 (N4,N15) (All Directions)
  • Seymour Road (N8) (All Directions)

[A40] High Holborn (WC1V,WC2B,WC1A) (Camden)

  Minimal

From: Tuesday 05 March 2019
To: Saturday 18 May 2019

Last updated 14:26 Monday 18 March 2019 : Traffic congestion is possible.

Works | Borough

[A40] High Holborn (WC1V/WC2B) (Westbound) between Procter Street and Southampton Row - Lane one (of four) is blocked due to works behalf of London Borough Of Camden.

  • A4200 (WC1V,WC2B,WC1B) (All Directions)
  • [A40] High Holborn (WC1V,WC2B,WC1A) (Westbound)
  • [A40] Procter Street (WC1V,WC2B,WC1A) (All Directions)
  • [A40] Southampton Place (WC1V,WC2B,WC1A) (All Directions)

[A219] Fulham Palace Road (W6) (Hammersmith & Fulham)

  Minimal

From: Monday 18 March 2019
To: Friday 22 March 2019

Last updated 20:56 Monday 18 March 2019 : There are no reported delays.

Works | Utility

[A219] Fulham Palace Road (W6) (Both Directions) at the junction of Beryl Road near Charing Cross Hospital - Contra-flow in operation reducing the carriageway to a single lane in both directions during Thames Water works.

  • Beryl Road (W6) (All Directions)
  • Biscay Road (W6) (All Directions)
  • Chancellor's Road (W6) (All Directions)

[A217] Wandsworth Bridge Road (SW6) (Hammersmith & Fulham)

  Minimal

From: Wednesday 20 February 2019
To: Saturday 30 March 2019

Last updated 14:33 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A217] Wandsworth Bridge Road (SW6) (Both directions) at the junction of Ryecroft Street - Carriageway restriction during maintenance works.

  • [A217] Wandsworth Bridge Road (SW6) (All Directions)

[A107] Mare Street (E9,E8) (Hackney)

  Minimal

From: Saturday 16 March 2019
To: Sunday 24 March 2019

Last updated 14:45 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A107] Mare Street (E8/E9) (All Directions) at the junction of St Thomas's Square - Lane restrictions in place to facilitate works.

  • London Lane (E8) (All Directions)
  • [A107] Mare Street (E9,E8) (All Directions)
  • St Thomas's Square (E9) (All Directions)

[A400] Charing Cross Road (W1T,WC2H) (Camden,Westminster)

  Minimal

From: Monday 28 January 2019
To: Tuesday 30 November 2021

Last updated 14:29 Monday 18 March 2019 : Traffic delays are possible.

Special and Planned Events | Construction Activity

Soho Place, [A400] Charing Cross Road (WC2) (Northbound) at the junction of Sutton Row and [A40] St Giles High Street - Lane restrictions and heavier traffic flow than usual expected until approximately late 2021 during works related to the "Soho Place" development.

  • A40 (WC1A,W1D,WC2H) (All Directions)
  • [A400] Charing Cross Road (W1T,WC2H) (Northbound)
  • Denmark Street (WC2H) (All Directions)
  • Earnshaw Street (WC2H) (All Directions)
  • Falconberg Mews (W1D) (All Directions)
  • Goslett Yard (WC2H) (All Directions)
  • Manette Street (WC2H,W1D) (All Directions)
  • Orange Yard (VW00) (All Directions)
  • Soho Square (W1D) (All Directions)
  • Sutton Row (W1D) (All Directions)
  • [A400] Tottenham Court Road (W1T,WC2H) (All Directions)

A205

[A205] Upper Richmond Road (SW15) (Wandsworth)

  Minimal

From: Tuesday 01 August 2017
To: Friday 22 March 2019

Last updated 14:30 Monday 18 March 2019 : Traffic is flowing well.

Special and Planned Events | Construction Activity

[A205] Upper Richmond Road (SW15) (Westbound) at the junction of Carlton Drive - Carriageway restrictions for deliveries between the following times: Mon-Fri 10am to 4pm & Sat 9am to 1pm.

  • Carlton Drive (SW15) (All Directions)
  • Oxford Road (SW15) (All Directions)

A41

[A41] Finchley Road (NW3) (Camden)

  Minimal

From: Friday 08 September 2017
To: Friday 06 September 2019

Last updated 14:33 Monday 18 March 2019 : Traffic delays are possible when restrictions are in place.

Works | Other

[A41] Finchley Road (NW3) (Northbound) at the junction of Lithos Road - Intermittent lane restrictions for loading and unloading during building works.

  • [A41] Finchley Road (NW3) (Northbound)
  • Lithos Road (NW3) (All Directions)

Inner Ring

A41

[A41] Baker Street (W1U,NW1) (Westminster)

  Minimal

From: Thursday 28 February 2019
To: Sunday 31 March 2019

Last updated 14:33 Monday 18 March 2019 : Delays are possible.

Works | Utility

[A41] Baker Street (NW1/W1U) (Southbound) at the junction of Marylebone Road - The footpath is partially restricted due to Thames Water works.

  • Bickenhall Street (W1U) (All Directions)
  • [A501] Marylebone Road (W1U,NW1) (All Directions)
  • Marylebone Road (All Directions)
  • Porter Street (W1U) (All Directions)